UM

Browse/Search Results:  1-3 of 3 Help

Selected(0)Clear Items/Page:    Sort:
Bidding Mechanism Design for Building Virtual Power Plant to Participate in Demand Response Markets 建 筑 虚 拟 电 厂 参 与 需 求 响 应 市 场 的 报 量 报 价 机 制 设 计 Journal article
Qi, Taoyi, Hui, Hongxun, Ye, Chengjin, Ding, Yi, Zhao, Yuming, Song, Yonghua. Bidding Mechanism Design for Building Virtual Power Plant to Participate in Demand Response Markets 建 筑 虚 拟 电 厂 参 与 需 求 响 应 市 场 的 报 量 报 价 机 制 设 计[J]. Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2024, 48(18), 14-24.
Authors:  Qi, Taoyi;  Hui, Hongxun;  Ye, Chengjin;  Ding, Yi;  Zhao, Yuming; et al.
Favorite | TC[Scopus]:0 | Submit date:2024/11/05
Bidding Mechanism  Demand Response  Electricity Market  Flexible Load  Urban Building  Virtual Power Plant  
Debris flow runout behaviors considering the influences of densely populated buildings Journal article
Zhang, Shuai, Fang, Zhe, Dai, Cong, Wang, Shuairong, Peng, Jingyu, Zhou, Yiling, Shen, Ping. Debris flow runout behaviors considering the influences of densely populated buildings[J]. Journal of Mountain Science, 2024, 21(8), 2696-2712.
Authors:  Zhang, Shuai;  Fang, Zhe;  Dai, Cong;  Wang, Shuairong;  Peng, Jingyu; et al.
Favorite | TC[WOS]:0 TC[Scopus]:0  IF:2.3/2.6 | Submit date:2024/09/03
Building Blockage Effect  Debris Flow  Risk  Urban Layout  Zhouqu  
Real-time multi-energy demand response for high-renewable buildings Journal article
Da Xu, Feili Zhong, Ziyi Bai, Zhibin Wu, Xiaodong Yang, Menglu Gao. Real-time multi-energy demand response for high-renewable buildings[J]. ENERGY AND BUILDINGS, 2023, 281, 112764.
Authors:  Da Xu;  Feili Zhong;  Ziyi Bai;  Zhibin Wu;  Xiaodong Yang; et al.
Favorite | TC[WOS]:27 TC[Scopus]:30  IF:6.6/6.7 | Submit date:2023/02/22
Smart Building  Demand Response  Urban Energy Systems  Energy Flexibility  Renewable Energy