UM

Browse/Search Results:  1-3 of 3 Help

Selected(0)Clear Items/Page:    Sort:
Integrated recovery system with bidding-based satisfaction: An adaptive multi-objective approach Journal article
Zhong,Huifen, Lian,Zhaotong, Zhou,Tianwei, Niu,Ben, Xue,Bowen. Integrated recovery system with bidding-based satisfaction: An adaptive multi-objective approach[J]. Expert Systems, 2023, 40(9), e13409.
Authors:  Zhong,Huifen;  Lian,Zhaotong;  Zhou,Tianwei;  Niu,Ben;  Xue,Bowen
Adobe PDF | Favorite | TC[WOS]:1 TC[Scopus]:1  IF:3.0/3.0 | Submit date:2023/07/21
Crew Satisfaction  Infeasible Solution Repair Procedures  Integrated Aircraft And Crew Recovery System  Multi-objective Optimization  Particle Swarm Optimization  
Short-term aviation maintenance technician scheduling based on dynamic task disassembly mechanism Journal article
Ben Niu, Bowen Xue, Huifen Zhong, Haiyun Qiu, Haiyun Qiu. Short-term aviation maintenance technician scheduling based on dynamic task disassembly mechanism[J]. Information Sciences, 2023, 629, 816-835.
Authors:  Ben Niu;  Bowen Xue;  Huifen Zhong;  Haiyun Qiu;  Haiyun Qiu
Favorite | TC[WOS]:3 TC[Scopus]:4  IF:0/0 | Submit date:2023/07/27
Aviation Maintenance Technician  Dynamic Task Disassembly  Flexible Time  Technician Exchange Method  
An integrated container terminal schedulingproblem with different‐berth sizes viamultiobjective hydrologic cycle optimization Journal article
Zhong, Huifen, Lian, Zhaotong, Xue, Bowen, Niu, Ben, Qu, Rong, Zhou, Tianwei. An integrated container terminal schedulingproblem with different‐berth sizes viamultiobjective hydrologic cycle optimization[J]. International Journal of Intelligent Systems, 2022, 37(12), 11909-11925.
Authors:  Zhong, Huifen;  Lian, Zhaotong;  Xue, Bowen;  Niu, Ben;  Qu, Rong; et al.
Favorite | TC[WOS]:1 TC[Scopus]:1  IF:5.0/5.9 | Submit date:2023/01/30
Evolutionary Computing Algorithm  Hydrologic Cycle Optimization  Integrated Berth And Quay Crane Allocation Problem  Multiobjective Optimization  Scheduling