Residential College | false |
Status | 已發表Published |
PESTEL Analysis of Factors Influencing the Demand and Supply of Modular Construction: Perspectives from Hong Kong | |
Zhang, Yidan1; Pan, Wei1; Pan, Mi2 | |
2024-06 | |
Conference Name | 41st International Symposium on Automation and Robotics in Construction (ISARC 2024) |
Source Publication | 2024 Proceedings of the 41st International Symposium on Automation and Robotics in Construction |
Pages | 1214-1221 |
Conference Date | 3-5 June 2024 |
Conference Place | Lille |
Country | France |
Publisher | International Association for Automation and Robotics in Construction (IAARC) |
Abstract | Modular construction (MC) shifts labour-intensive site-based activities to an off-site controlled environment through prefabrication, and is deemed an innovative approach for industry transformation. To maximise the benefits of MC, there is a need to predict the demand volume and supply capacity to inform proactive and strategic supply chain planning and development. This study aims to provide a holistic exploration of the factors influencing the MC market, based on a literature review and a study of the case of modular integrated construction (MiC) in Hong Kong. A systematic framework was proposed with 15 demand-related factors and 10 supply-related factors to explain the complex influential mechanism from the political, economic, social, technological, environmental, and legal (PESTEL) perspectives, which contribute to the understanding of the dynamic evolution of the MiC market. The findings revealed that the influencing factors are manifold, with the political factors influencing the MiC demand the most and the economic factors determining the development pattern of the MiC supply. The presented study lays a foundation for the establishment of a practical MC demand-and-supply model for better market planning. Attention should be devoted to rationalising the quantification of qualitative factors in future research. |
Keyword | Influencing Factors Market Dynamics Modular Construction Pestel Analysis DemAnd And Supply |
DOI | 10.22260/ISARC2024/0157 |
URL | View the original |
Language | 英語English |
Scopus ID | 2-s2.0-85199631516 |
Fulltext Access | |
Citation statistics | |
Document Type | Conference paper |
Collection | Faculty of Science and Technology DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING |
Corresponding Author | Zhang, Yidan; Pan, Wei; Pan, Mi |
Affiliation | 1.Department of Civil Engineering, The University of Hong Kong, Hong Kong 2.Department of Civil and Environmental Engineering, University of Macau, Macao |
Corresponding Author Affilication | University of Macau |
Recommended Citation GB/T 7714 | Zhang, Yidan,Pan, Wei,Pan, Mi. PESTEL Analysis of Factors Influencing the Demand and Supply of Modular Construction: Perspectives from Hong Kong[C]:International Association for Automation and Robotics in Construction (IAARC), 2024, 1214-1221. |
APA | Zhang, Yidan., Pan, Wei., & Pan, Mi (2024). PESTEL Analysis of Factors Influencing the Demand and Supply of Modular Construction: Perspectives from Hong Kong. 2024 Proceedings of the 41st International Symposium on Automation and Robotics in Construction, 1214-1221. |
Files in This Item: | There are no files associated with this item. |
Items in the repository are protected by copyright, with all rights reserved, unless otherwise indicated.
Edit Comment